In early December for the first time the switch was flipped and P1 came on line. The big questions were: Would the technology work successfully? How good were our processes? There were many areas from accurate equipment calibrations to the programming and precision of the software that we needed to give us the engineering outcome we were looking for. There was zero percent error in our design but until it was built and tested there was no proof.
Most importantly how exact was our yield? Were we going to expect 1 Litre and only get 900 mls out? We wanted 100% result and got 99.9% yield on our very first commercial batch. A very pleasing result for what is just the beginning for Biodx.